Voith Hydro has provided two full energy models (5 and 6) for the Changlongshan pumped storage plant in japanese China.
A bird’s eye view of Changlongshan pumped storage plant – Image courtesy of Voith.
Earlier เกจวัดแรงดันดิจิตอล , unit 5 efficiently handed a 15-day trial operation and was officially put into commercial operation. It is the world’s first reversible pumped storage unit with a rated velocity of 600 r/min and a capacity of 350 MW. There are six units installed in complete at the 2.1 GW Changlongshan station situated in Zhejiang Province.
Voith says that the performance of unit 5 received excellent feedback from the house owners and consultants within the industry.
“The data confirmed that the unit meets our excellence criteria and thereby proves that the engineering, manufacturing, installation and commissioning of the world’s first 600 r/min with 350 MW unit was profitable,” mentioned Zhang Chengping, mechanical and electrical chief engineer at plant operator the China Three Gorges Group (CTG).
Share