Enerpac has launched its RP-70A hydraulic rail stressor and ZC3-Series battery powered stressing pump which supplies a cordless, light-weight, zero emission, rail stressor kit for rail track thermite welding.
Traditional totally assembled rail pullers are too heavy for operators to comfortably transport and deploy safely and shortly. The Enerpac RP70A stressor uses modular parts that can be assembled and installed on site with out the need for tools, making preparation for rail stressing easier and safer. Assembly usually takes lower than two minutes.
The Enerpac rail stressing package is designed for railway upkeep crews who assemble and set up the rail puller instantly on web site when adjusting the hole between rail ends for rail stressing, rail welding, repairing rail failures and servicing insulators. The sturdy, simple assembly components, including Enerpac ZC3-Series pump and hose set, are up to thrice lighter than comparable tools. pressure gauge ลม can be transported in an optional specifically designed steel transport frame.
The RP70A stressor has a 70-tonne pulling and 35-tonne pushing capacity while holding the rail in neutral size through the thermite welding process.
Share